Jolshiri Abashon · Residential
Asseto Lumière
Lake Drive, Sector 12, Jolshiri Abashon
- On sale
- Under construction
Overview
Asseto Lumière is our Jolshiri flagship: eight full-floor residences above a double-height mezzanine lounge, each with 3,050 sqft, four bedrooms and a wraparound balcony facing the lake. A private lift lobby opens directly into every home.
The roof carries a lap pool and a planted terrace, and the building stands on its own ten-katha plot on a 60-foot avenue. Piling is complete and the ground-floor structure is under way.

At a glance
- Storeys
- G+M+8
- Land area
- 10 katha
- Front road
- 60 ft
- Apartments per floor
- 1
Plans
Typical floor
1 apartment on every floor. Choose the space that fits your life.
Unit A
3,050 sqft
- Beds
- 4
- Baths
- 5
- Available
- 6 of 8
Typical floor · Asseto Lumière · NTS (not to scale)
Availability
Unit mix
6 of 8 apartments are available right now; 1 more are on hold for buyers completing their booking.
Available units: 6 of 8
| Apartment | Floor | Size | Beds | Baths | Status |
|---|---|---|---|---|---|
| A2 | Level 2 | 3,050 sqft | 4 | 5 | Available |
| A3 | Level 3 | 3,050 sqft | 4 | 5 | Available |
| A4 | Level 4 | 3,050 sqft | 4 | 5 | Available |
| A5 | Level 5 | 3,050 sqft | 4 | 5 | Available |
| A6 | Level 6 | 3,050 sqft | 4 | 5 | Available |
| A8 | Level 8 | 3,050 sqft | 4 | 5 | Available |
Apartment A2
Available- Floor
- Level 2
- Size
- 3,050 sqft
- Beds
- 4
- Baths
- 5
Apartment A3
Available- Floor
- Level 3
- Size
- 3,050 sqft
- Beds
- 4
- Baths
- 5
Apartment A4
Available- Floor
- Level 4
- Size
- 3,050 sqft
- Beds
- 4
- Baths
- 5
Apartment A5
Available- Floor
- Level 5
- Size
- 3,050 sqft
- Beds
- 4
- Baths
- 5
Apartment A6
Available- Floor
- Level 6
- Size
- 3,050 sqft
- Beds
- 4
- Baths
- 5
Apartment A8
Available- Floor
- Level 8
- Size
- 3,050 sqft
- Beds
- 4
- Baths
- 5
Shared spaces
Amenities
What residents share at Asseto Lumière.
Reception lobby
Rooftop garden
Swimming pool
Community hall
Car parking
Passenger lifts
Neighbourhood
Location
Jolshiri Abashon
Jolshiri Abashon, Dhaka
Address
Lake Drive, Sector 12, Jolshiri Abashon, DhakaOpen in Google Maps (opens in a new tab)Nearby
- Jolshiri central lake0.4 km
- 300 Feet Road1 km
- International Convention City Bashundhara6 km
- Bashundhara R/A7 km
- Kuril Flyover9 km
- Hazrat Shahjalal International Airport12 km
Approximate road distances.
Specifications
The building in detail
How Asseto Lumière is planned, built and handed over.
- Above ground
- 10 storeys
- Below ground
- None
Plot and structure
- Building type
- G+M+8
- Land area
- 10 katha
- Front road
- 60 ft
- Structure
- RCC frame designed to BNBC 2020, including seismic detailing
- Foundation
- Bored cast-in-situ piles designed from a site soil test
Apartments
- Total shares
- 8
- Units per floor
- 1
- Apartment sizes
- 3,050 sqft
- Bedrooms
- 4
- Bathrooms
- 5
Facilities
- Passenger lifts
- 2
- Cargo lifts
- 1
- Generator backup
- Yes
- Car parking
- Yes
- Rooftop garden
- Yes
- Swimming pool
- Yes
- Convention hall
- Yes
Terms
- Service charge
- 12% of the actual construction cost
- Handover
- Jun 2028
Contact
Visit Asseto Lumière
Call, message or email our sales team and we will walk you through Asseto Lumière, from floor plans and pricing to a site visit.
- Call the hotline +880 1000-000001
- WhatsApp +880 1000-000001 (opens in a new tab)
- Email info@asseto.example
Sales office
- Address
- Level 9, Asseto Tower, 28 Gulshan Avenue, Gulshan-2, Dhaka 1212
- Office hours
- Saturday – Thursday: 9:30 AM – 6:30 PM
Keep exploring
More Asseto homes
More Asseto homes in Jolshiri Abashon and across Dhaka.
On saleSector 15, Jolshiri Abashon
Asseto Nirvana
Upcoming
- Beds
- 4
- Size
- 2,450 sqft
- From
- ৳ 9,999
/sqft
Handover Dec 2029, 16 homes
On saleRoad 8, Block D, Bashundhara R/A
Asseto Serenade
Under construction
- Beds
- 3
- Size
- 1,850 sqft
- From
- ৳ 7,200
/sqft
Handover Dec 2027, 18 homes
On saleAvenue 2, Sector 2, Khagan Parkside, Ashulia
Asseto Evergreen Heights
Under construction
- Beds
- 3
- Size
- 1,320 sqft
- From
- ৳ 4,600
/sqft
Handover Mar 2028, 56 homes